Construction Scheduling

Construction Scheduling

课程
en
英语
15 时
此内容评级为 4.8/5
来源
  • 来自www.coursera.org
状况
  • 自定进度
  • 免费获取
  • 收费证书
更多信息
  • 5 序列
  • 等级 介绍

Their employees are learning daily with Edflex

  • Safran
  • Air France
  • TotalEnergies
  • Generali
Learn more

课程详情

教学大纲

  • Week 1 - Introduction to Construction Scheduling
    The first module provides an overview of the Construction Scheduling course and the topics that will be covered. Learners will discover the relationships connecting construction activities, how to perform scheduling procedures, how to determine critical path a...
  • Week 1 - Bar (Gantt) Charts
    The second module introduces bar or Gantt charts and how they are used as scheduling tools. Bar charts represent a project work item or activity as a time scaled bar; the length of which represents the planned duration of a construction activity.
  • Week 1 - Activity Precedence Diagrams
    In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.
  • Week 1 - Types of Construction Activity Relationships
    This module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram.
  • Week 1 - Forward and Backward Pass Calculations
    Forward and Backward Pass Calculations are covered in this module. Forward Pass Calculations determine the minimum dates at which each construction activity can be performed and, ultimately, the minimum duration of a construction project. Backward Pass Calcula...
  • Week 2 - Critical Path
    Professor Odeh discusses the importance of critical path in this module including what it is and why it is important. Learners will identify a critical path in a project and how to determine a critical path in different relationships.
  • Week 2 - Activity Floats
    Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.
  • Week 2 - Understanding Work Dates and Calendar Dates
    In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.
  • Week 3 - Activity on Arrow
    Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.
  • Week 3 - Program Evaluation & Review Technique (PERT) and Range Estimating
    The Program Evaluation and Review Technique (PERT) is introduced in this module which relates to uncertainty in estimating the duration of construction activities in a project schedule. PERT helps project managers determine the probability of a project being c...
  • Week 3 - The Role of the Scheduler in Construction Management
    Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.
  • Week 4 - Linear Construction Operations and Line of Balance
    Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.
  • Week 4 - Technology Applications for Scheduling
    Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.
  • Week 5 - Scheduling for Large Programs
    Christopher Toomey, Senior Vice President of AECOM Global Programs, discussed scheduling for large programs also known as the Integrated Master Scheduler. Mr. Toomey illustrates how to develop and maintain the Integrated Master Schedule and identifies key feat...
  • Week 5 - Risk Allocation and Planning
    Dr. Eduardo Gamez, Deputy Director of Risk Management for AECOM, introduces Risk Allocation and Planning. Dr. Gamez discusses the importance of formal risk management and how to use risk assessment as a support tool for planning and scheduling.
  • Week 5 - Lean Design in Construction Scheduling
    Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.

先决条件

没有。

讲师

Ibrahim Odeh, Ph.D., MBA
Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
Director of Research and Founder, Global Leaders in Construction Management

编辑

哥伦比亚大学是一所私立大学,位于美国纽约曼哈顿区西北部的晨边高地。它起源于 1754 年由英国国王乔治二世创建的国王学院。哥伦比亚大学是美国历史最悠久的高等学府之一,也是常春藤联盟(Ivy League)的成员之一,常春藤联盟由美国历史最悠久、最著名、最有声望和最精英化的八所大学组成。

哥伦比亚大学是世界上最挑剔、最负盛名的大学之一。2019 年的录取率为 5.1%,与哈佛大学和斯坦福大学相当。其研究水平在美国排名第一,在CUWR世界千强大学排名中位列世界第六(美国第四),在上海大学排名中位列第八。

平台

Coursera是一家数字公司,提供由位于加利福尼亚州山景城的计算机教师Andrew Ng和达芙妮科勒斯坦福大学创建的大型开放式在线课程。

Coursera与顶尖大学和组织合作,在线提供一些课程,并提供许多科目的课程,包括:物理,工程,人文,医学,生物学,社会科学,数学,商业,计算机科学,数字营销,数据科学 和其他科目。

此内容评级为 4.8/5
(没有评论)
此内容评级为 4.8/5
(没有评论)
完成这个资源,写一篇评论