Construction Scheduling
date_range Débute le 4 février 2019
event_note Se termine le 18 mars 2019
list 5 séquences
assignment Niveau : Introductif
chat_bubble_outline Langue : Anglais
card_giftcard 120 points
Envie de partager ce MOOC dans votre entreprise ?
My Mooc
For Business
Avis de la communauté
4.8
starstarstarstar
19 avis

Les infos clés

credit_card Formation gratuite
verified_user Certification payante
timer 15 heures de cours

En résumé

Learners will discover the key project scheduling techniques and procedures including; how to create a network diagram, how to define the importance of the critical path in a project network, and defining project activities float. Also covered are the fundamentals of Bar Charts, Precedence Diagrams, Activity on Arrow, PERT, Range Estimating, and linear project operations and the line of balance.

more_horiz Lire plus
more_horiz Lire moins
dns

Le programme

  • Week 1 - Introduction to Construction Scheduling
    The first module provides an overview of the Construction Scheduling course and the topics that will be covered. Learners will discover the relationships connecting construction activities, how to perform scheduling procedures, how to determine critical path a...
  • Week 1 - Bar (Gantt) Charts
    The second module introduces bar or Gantt charts and how they are used as scheduling tools. Bar charts represent a project work item or activity as a time scaled bar; the length of which represents the planned duration of a construction activity.
  • Week 1 - Activity Precedence Diagrams
    In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.
  • Week 1 - Types of Construction Activity Relationships
    This module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram.
  • Week 1 - Forward and Backward Pass Calculations
    Forward and Backward Pass Calculations are covered in this module. Forward Pass Calculations determine the minimum dates at which each construction activity can be performed and, ultimately, the minimum duration of a construction project. Backward Pass Calcula...
  • Week 2 - Critical Path
    Professor Odeh discusses the importance of critical path in this module including what it is and why it is important. Learners will identify a critical path in a project and how to determine a critical path in different relationships.
  • Week 2 - Activity Floats
    Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.
  • Week 2 - Understanding Work Dates and Calendar Dates
    In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.
  • Week 3 - Activity on Arrow
    Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.
  • Week 3 - Program Evaluation & Review Technique (PERT) and Range Estimating
    The Program Evaluation and Review Technique (PERT) is introduced in this module which relates to uncertainty in estimating the duration of construction activities in a project schedule. PERT helps project managers determine the probability of a project being c...
  • Week 3 - The Role of the Scheduler in Construction Management
    Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.
  • Week 4 - Linear Construction Operations and Line of Balance
    Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.
  • Week 4 - Technology Applications for Scheduling
    Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.
  • Week 5 - Scheduling for Large Programs
    Christopher Toomey, Senior Vice President of AECOM Global Programs, discussed scheduling for large programs also known as the Integrated Master Scheduler. Mr. Toomey illustrates how to develop and maintain the Integrated Master Schedule and identifies key feat...
  • Week 5 - Risk Allocation and Planning
    Dr. Eduardo Gamez, Deputy Director of Risk Management for AECOM, introduces Risk Allocation and Planning. Dr. Gamez discusses the importance of formal risk management and how to use risk assessment as a support tool for planning and scheduling.
  • Week 5 - Lean Design in Construction Scheduling
    Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.
record_voice_over

Les intervenants

Ibrahim Odeh, Ph.D., MBA
Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
Director of Research and Founder, Global Leaders in Construction Management

store

Le concepteur

For more than 250 years, Columbia has been a leader in higher education in the nation and around the world. At the core of our wide range of academic inquiry is the commitment to attract and engage the best minds in pursuit of greater human understanding, pioneering new discoveries and service to society.
assistant

La plateforme

Coursera est une entreprise numérique proposant des formations en ligne ouverte à tous fondée par les professeurs d'informatique Andrew Ng et Daphne Koller de l'université Stanford, située à Mountain View, Californie.

Ce qui la différencie le plus des autres plateformes MOOC, c'est qu'elle travaille qu'avec les meilleures universités et organisations mondiales et diffuse leurs contenus sur le web.

Avis de la communauté
4.8 /5 Moyenne
starstarstarstarstar
15
starstarstarstarstar
4
starstarstarstarstar
0
starstarstarstarstar
0
starstarstarstarstar
0
Contenu
4.8/5
Plateforme
4.8/5
Animation
4.8/5
Le meilleur avis

Very informative course which covers the fundamentals of Construction Scheduling. I learned essential scheduler tools such as how to draw an AON diagram, AOA diagram, LoB Diagram that will help me in my future career as Civil Engineer. In addition, it gives an introduction to Microsoft Project and Primavera P6 which are some of the most important software in the market. To wrap it up, I learned a great deal in this course and I recommend it to anyone interested in the Construction sector.

le 29 décembre 2017
Vous êtes le concepteur de ce MOOC ?
Quelle note donnez-vous à cette ressource ?
Contenu
0/5
Plateforme
0/5
Animation
0/5
le 29 décembre 2017
starstarstarstarstar

Very informative course which covers the fundamentals of Construction Scheduling. I learned essential scheduler tools such as how to draw an AON diagram, AOA diagram, LoB Diagram that will help me in my future career as Civil Engineer. In addition, it gives an introduction to Microsoft Project and Primavera P6 which are some of the most important software in the market. To wrap it up, I learned a great deal in this course and I recommend it to anyone interested in the Construction sector.

le 30 novembre 2017
starstarstarstarstar

I found this to be a good introduction to scheduling, the methods involved and the base techniques required to get your feet wet. In general due to the large variation in scheduling methods discussed, each learner would be required to step out and explore more on their own for a deeper look in to the processes. Real time scheduling videos were great, i often step in to new programs see all the buttons and feel overwhelmed but after these quick videos and breakdowns we learned the essential thought processes that go into the background design of each scheduling software. I enjoyed the set up, discussions and interactive schedule building.

le 7 novembre 2017
starstarstarstarstar

This course is very helpful in learning various tools and method for construction scheduling. I particularly enjoyed learning about AON and LEAN Construction. The course is well organized with lecture and interactive exercises that are challenging and useful.

le 2 novembre 2017
starstarstarstarstar

Very very good course for those in the construction as well as those pondering an entry into the field. Deals with all the concepts really well and gives very clear and concise explanations for all the concepts

le 28 octobre 2017
starstarstarstarstar

It is imperative course in the construction industry and the most important aspect of the industry. All the professors were superb,,,